Generator sizing · TOPIC OVERVIEW

Generator sizing

Generator sizing is the process of matching a generator’s electrical capacity and transient performance to the loads it must supply. A useful assessment includes steady running demand, motor starting events, the order in which loads connect, and the rating available on the chosen fuel. [1]

In this topic

Where to start

Begin with a list of the equipment that matters during an outage. Record its electrical input, voltage, operating pattern, and any starting requirements. A building’s floor area or monthly energy use does not describe the instantaneous load a generator must accept.

The fundamentals article explains the overall decision. Calculating running load covers the steady total; calculating motor starting load covers the temporary demand. Load management explains how selected equipment can be delayed or withheld when capacity is limited.

From estimate to selection

A wattage total is a planning input. It does not establish that a particular generator can start a compressor, hold an acceptable voltage, or deliver the same output on every fuel. For a building system, the installer or designer checks the load assessment against manufacturer performance data and the proposed transfer and fuel equipment. Keep estimated values clearly identified until they can be replaced with equipment-specific information. [1] [2]

Sources and further reading

  1. Cummins — Understanding transient performance ↗www.cummins.com
  2. Honda — Determining generator power requirements ↗powerequipment.honda.com

Use the manual and nameplate for the exact model. Local requirements and site conditions take precedence over general examples.